Blair’s tyres needed to relocate to a larger premises. The only problem was the warehouses at 200 Neilson street Onehunga had no power at all. In conjunction with Beckett construction Powered up electrical designed, coordinated and installed mains power distribution and articulation for the 3 warehouses on site.
Blairs Tyres
March 27, 2013 by